Bogor, 12 December 2025 – The Ministry of Public Works (PU) through the Toll Road Regulatory Agency (BPJT) ensures full infrastructure readiness and traffic security on the Bogor–Ciawi–Sukabumi (Bocimi) Toll Road. This was done to anticipate a surge in community mobility in the Ciawi, Bogor and Sukabumi areas ahead of the 2025 Christmas and 2026 New Year (Nataru) holidays.
Minister
Public Works, Dody Hanggodo, emphasized that all infrastructure is good
Toll roads and national roads must function optimally throughout the period
Nataru services to ensure the comfort and safety of road users.
“National route
and toll roads must operate smoothly so that people’s mobility is maintained. Entire
“Strategic steps have been prepared and just need to be implemented according to plan,” he stressed
Minister Dody.
As access
important for tourist and residential areas in South Bogor to Sukabumi,
It is predicted that the Bocimi Toll Road will become a concentration point for traffic density.
Currently, the Bocimi Toll Road has an operational length of 26.40 kilometers consisting of
from Section 1 Ciawi–Cigombong (15.35 km) and Section 2
Cigombong–Cibadak/Parungkuda (11.05 km).
President director
PT Trans Jabar Toll, Abdul Hakim Supriyadi, explained that his party had
strengthen traffic control and field supervision.
“Nataru Post
at the Parungkuda Toll Gate functions as a coordination and traffic monitoring center
traffic, and incident management. Officers are also stationed at vulnerable points
density to speed up handling of field conditions,” said Abdul Hakim in
Bogor, Thursday (11/12/2025).
PT Trans Jabar
Toll projects the traffic volume at the Parungkuda main gate will be
reaching 35,000 to 40,000 vehicles during the year-end holiday period
This. Remembering the position of the Parungkuda Toll Gate which is close to the point
Cibadak Market congestion, intensive coordination was carried out with the National Police Traffic Corps.
Traffic engineering has been prepared together with the National Police Traffic Corps to unravel it
potential for congestion in the toll gate exit area bordering the market.
Besides
smooth running, safety aspects are a top priority with strict monitoring
against Minimum Service Standards (SPM), which include road conditions,
accessibility, average travel speed, and readiness of rescue units.
Face
rainy season, the Ministry of Public Works also alerts a team Disaster Assistance Unit (DRU). This team
equipped with rapid handling equipment and emergency materials, such as cold mixture for patching holes
instantly in order to maintain the quality of the road and remain safe to traverse. The entire fleet
emergency services, ranging from tow trucks, ambulances, to vehicles savehas also been prepared.
Road users
are advised to always obey traffic signs and use official channels
If you experience problems, you can contact, among other things Call Center 14080 or hot phone line
Local BUJT for faster response.
Work program
This is part of the “A Year of Working, Moving – Having an Impact” program
ASTA CITA from President Prabowo Subianto.
#SigapDevelopingTheNationForThePeople
#AnImpactYear
This article also appeared on VRTimes
News
Berita Teknologi
Berita Olahraga
Sports news
sports
Motivation
football prediction
technology
Berita Technologi
Berita Terkini
Tempat Wisata
News Flash
Football
Gaming
Game News
Gamers
Jasa Artikel
Jasa Backlink
Agen234
Agen234
Agen234
Resep
Cek Ongkir Cargo
Download Film